Concrete & Heavy Debris · Janesville, WI
Concrete & Heavy Debris Dumpsters in Janesville, WI
Low-side 10 yard containers built for concrete, brick, block, asphalt, dirt and rock — kept clean so the load goes to a crusher instead of a landfill.
- Same-day & next-day delivery
- Flat-rate, all-in pricing
- Driveway protection included

- Same-Day DeliveryCall before noon and we can usually be there today.
- Flat-Rate PricingDelivery, pickup, disposal and tax quoted up front.
- Licensed & InsuredFully insured and licensed to haul in Wisconsin.
- Locally Owned2012-founded, family run, based right here in Janesville.
Overview
Concrete & Heavy Debris in Janesville
Concrete is a different rental to everything else we do. With household junk or demolition debris you are buying space in a box. With concrete you are buying weight, and you will hit the weight limit long before the container looks full. That is not a rule we made up to sell more boxes — it is what a truck axle can legally carry down Milton Avenue.
Here is the arithmetic. A cubic yard of broken concrete runs somewhere around 3,700 to 4,000 pounds. Fill a 10 yard container to the rails and you are asking a driver to lift close to twenty tons. It will not happen. In practice a clean concrete load sits two to four feet deep in a low-side 10 yard, and that is a full load. Everyone who has never done it before looks at the box on pickup day and thinks it is half empty. It is not.
The second rule is just as important: concrete has to be a dedicated single-material load. Clean inert material — concrete, brick, block, asphalt, rock, and dirt in its own separate load — can go to a crusher or recycler and come back out as base course. Throw in a few 2x4s, a bag of household trash, some old fence posts and a roll of carpet and the whole thing is now mixed waste headed for a landfill, at landfill pricing. One contaminated corner ruins the whole box. Keeping it clean is the cheapest thing you can do on the job.
Little J's has been running these loads out of the yard at 103 S Grant Ave since 2012. Flat rate covers delivery, pickup, the weight allowance for that material, disposal and tax, on a standard seven-day rental with same-day or next-day delivery when we have a truck free. Every residential drop gets driveway protection boards, which matters more here than on any other job we do. Call (608) 531-8367, tell us the square footage and the thickness, and we will tell you how many boxes it takes.
Accepted materials
What goes in — and what doesn't
Good for
- Driveway and apron tear-out
- Sidewalk and step replacement
- Patio and paver slab removal
- Brick, block and mortar rubble
- Broken asphalt from drives and lots
- Clean fill dirt and excavation soil
- Farm pads, silo bases and footings
Cannot go in
- Wood, forms or framing lumber
- Household trash or bagged waste
- Asphalt shingles and roofing debris
- Drywall, carpet and insulation
- Painted or coated debris that is flaking
- Heavy structural steel or rebar cages
Wisconsin bans a specific list of materials from landfills. If you are unsure about an item, call (608) 531-8367 before it goes in the container — it costs nothing to ask and a lot to sort out afterwards. Full detail in our banned materials guide.
Weight Is the Limit, Not Volume
Every other kind of dumpster runs out of room. This one runs out of pounds. Understanding that up front stops most of the surprises.
Rough weights you can plan around
- Broken concrete: about 3,700-4,000 lb per cubic yard
- Brick and block: roughly 3,000-3,500 lb per cubic yard, a bit less if it is hollow block
- Broken asphalt: about 3,000-3,500 lb per cubic yard
- Dirt and soil: about 2,000-2,700 lb per cubic yard dry, considerably more when it is wet clay
- Sod: heavier than people expect, because it is mostly wet soil
Translate that into a slab. A hundred square feet of four-inch concrete is about two and a half tons. A twenty-by-twenty two-car driveway apron at four inches is therefore near ten tons before you count the thickened edges — that is more than one load. Six-inch work, which is what most farm pads, silo bases and commercial aprons are, is half again heavier per square foot.
What this means practically
We give you a fill line on the container and we mean it. If the box comes back over weight the driver either leaves material behind or the load costs more, and neither of those is a good morning for anybody. Break slab into pieces you can lift and stack rather than heaping rubble — flat pieces laid in courses fit more tonnage per box than jagged chunks with air between them.
If your project is bigger than one box, say so when you book. We would rather schedule three staged 10 yard swaps than have you discover it halfway through a Saturday. See the 10 yard container spec for dimensions and the fill line we work to.
What Counts as a Clean Load
"Clean" has a specific meaning in this trade, and it is worth being precise about because it is the difference between recycling rates and landfill rates.
Yes — clean inert, all in one load
- Poured concrete: slabs, sidewalks, steps, footings, curb
- Concrete block, cinder block, clay brick and mortar
- Broken asphalt from driveways and lots
- Fieldstone, rock, gravel and crushed base
- Clean dirt and soil — but as its own load, not mixed with concrete
No — these contaminate the load
- Wood of any kind, including forms and stakes left attached
- Household trash, bags, carpet, drywall, insulation
- Plastic sheeting, vapour barrier, landscape fabric, foam board
- Painted or sealed material where the coating is flaking off heavily
- Asphalt shingles — that is roofing waste, not inert material
- Tyres, appliances, paint cans, anything liquid
Rebar, honestly
Light reinforcement cast into a slab — half-inch bar on a grid, welded wire mesh, fibre mesh — is normally fine and does not need to be cut out. Crushers run magnets. What causes problems is heavy structural steel, dense cages, post-tension cable, long protruding bar that will not fit inside the box, and rebar with more steel than concrete around it. Do not guess: call (608) 531-8367, describe what is in the slab, and we will confirm before the truck rolls. We would far rather answer that question on the phone than have a load rejected at the gate.
The state's DNR recycling pages are a good background read on why separated material is handled differently. Our own rundown is in what can go in a dumpster in Wisconsin.
Driveways, Sidewalks, Patios and Footings
Most of the concrete we haul in Janesville comes out of the ground for one of two reasons: it heaved, or it is being replaced as part of something bigger.
Frost heave season
Southern Wisconsin's freeze-thaw cycle is brutal on flatwork. Water gets under a slab, freezes, lifts it, thaws, and drops it back slightly out of line. Do that thirty winters running and you get the cracked, tilted, trip-hazard sidewalks and aprons you see all over the older neighbourhoods. Once a panel has heaved there is no fixing it with patch — it comes out. Spring and early summer, once the ground has dried out, is when most of that work happens here, and it is our busiest stretch for 10 yard concrete boxes.
Sizing common jobs
- City lot sidewalk, 4 ft wide, 4 in thick: roughly forty to fifty linear feet per load
- Single-car driveway, 10x40 at 4 in: plan on three or four 10 yard loads
- Patio, 12x16 at 4 in: usually one full load, maybe a bit over
- Garage slab, 20x22 at 4 in: four loads or more, plus thickened edges and footings
- Front steps and stoop: almost always heavier than they look — solid pours, not hollow
Footings and dirt
Footings are deep, dense and often have the most steel in them. Dirt from a footing dig should go in its own container rather than on top of concrete — crushers do not want soil in their feed. If you are digging new footings after the old work comes out, call 811 first; that is a legal requirement, not a courtesy.
Teardowns that produce both structure debris and slab are covered on our demolition debris page — run two boxes, not one.
Placing a Heavy Box Without Wrecking the Driveway
A concrete container is the heaviest thing that will ever sit on your property, and the truck delivering it is not light either. Placement is worth two minutes of thought.
What the driver needs
- A straight approach of roughly sixty feet to back in and roll the box off
- About twelve feet of width and a clear path — no parked cars, no bins, no basketball hoop
- Around twenty-two feet of overhead clearance: watch for low branches, service drops and gutters
- Reasonably level, firm ground at the drop point
Surfaces, ranked
Gravel and compacted stone is ideal. Concrete drive in decent condition is fine. Asphalt is the one to be careful with — in July it softens, and a loaded box will leave impressions. An older drive that is already cracked or frost-heaved may not survive a full concrete load, and we will tell you if we think that is the case rather than pretend otherwise. Lawn is a last resort; wet spring turf and twenty tons do not mix, and you will be reseeding ruts.
We put protection boards under the wheels and rails on every residential drop as standard. That spreads the load and stops point contact, but boards are not magic — they reduce risk, they do not eliminate it on a drive that is already failing. If your driveway is the thing being replaced, the easy answer is to put the box directly on it. If it is staying, consider the street or a stone pad instead, and ask us about right-of-way placement in the city.
More detail in protecting your driveway during delivery. To pick a spot, ring the yard at (608) 531-8367 before delivery day.
Spring Thaw, Posted Roads and Rural Rock County
From roughly March into April, town and county road authorities across Wisconsin post seasonal weight limits. The reason is simple: as frost comes out of the ground, the subgrade under a rural road turns soft, and a heavy axle will pump and break the pavement. Concrete loads are exactly the kind of weight those postings exist to keep off.
How it affects your job
- Deliveries and pickups on posted town roads out toward Orfordville, Footville, Clinton and Brodhead may be delayed or rerouted until restrictions lift
- We may need to run a lighter load, meaning more swaps on the same amount of material
- Farm lanes and gravel drives soften badly in thaw — a fully loaded truck can rut them or sink
- Postings can come on and off with the weather rather than on a fixed calendar
None of this is a reason to avoid spring work. It is a reason to book early and to be honest with us about where the site is. If the address is on a gravel town road eight miles out, tell us at booking. We will plan the route, the load size and the timing around it rather than discovering the problem with a truck already committed. Postings are published by the relevant road authority; general information on Wisconsin's seasonal weight restrictions is available from WisDOT.
Once the ground firms up in late spring, everything opens back up and we run full loads anywhere in the county. That is also when the flatwork replacement rush starts, so if you know you are tearing out a driveway in June, put yourself on the schedule in May. Coverage across the county is listed on our service area page, including Orfordville and the surrounding townships.
Sizing
Which size for this job?
| Container | When it suits this job |
|---|---|
| 10 Yard | The right container for almost every concrete, brick, asphalt or dirt job. Low sides so you can lift pieces in, and it reaches weight around two to four feet deep. |
| 15 Yard | Occasionally used for lighter inert material such as hollow block or clean fill, where volume matters more than density. Ask us first. |
| 20 Yard | Not usual for pure concrete. Fine for mixed masonry demolition where the load is block and brick with some structure debris, on a reduced fill line. |
| 30 Yard | Not used for concrete. Listed here so you can pair it with a 10 yard on a teardown — structure in the 30, slab in the 10. |
| 40 Yard | Never for inert material. Bulky, light debris only. Mentioned so nobody orders one for a driveway tear-out. |
Still weighing it up? Read the full sizing guide, compare every container size, or just describe the job on the phone and we will pick for you.
Need concrete & heavy debris in Janesville?
One call gets you a size, a flat rate and a delivery slot. Usually under four minutes.
Answers
Concrete & Heavy Debris — questions we get asked
Why do I need a 10 yard for concrete when I have way more than 10 yards of it?
Because the constraint is weight, not space. Broken concrete weighs close to two tons per cubic yard, so a 10 yard box reaches its legal limit around two to four feet deep. A bigger container would just tempt you to overload it, and an overweight box cannot legally leave your driveway. If you have a large tear-out we schedule multiple 10 yard swaps instead. Tell us the square footage and thickness and we will work out how many.
Can I throw a few boards or bags of trash in with the concrete?
No, and this is the expensive mistake. A clean inert load goes to a crusher and gets recycled into base material. Add wood, trash, carpet or plastic and it is no longer an inert load at all: it becomes mixed waste and gets priced and disposed of accordingly. One corner of contamination affects the whole box. Order a separate container for the rest of the debris and you will spend less overall, not more.
Is rebar in the concrete a problem?
Usually not. Light reinforcement cast in a slab, welded wire mesh and fibre mesh are normally acceptable, since crushers pull steel with magnets. What causes trouble is heavy structural steel, dense rebar cages, post-tension cable and long bar sticking out past the container walls. Rather than guess, call us at (608) 531-8367 and describe the slab before delivery. A two-minute phone call beats a rejected load at the gate.
Can dirt go in the same load as concrete?
Keep them separate. Both are inert, but recyclers and crushers do not want soil in their concrete feed, and clean fill dirt has its own outlets. If you are removing a slab and digging out the base beneath it, plan on two loads or two staged pickups. Wet clay is also far heavier than people expect, so a dirt box fills its weight allowance quickly too. Mention it when you book and we will size accordingly.
Will a concrete dumpster damage my driveway?
It is the highest-risk load we deliver, so we put protection boards under the wheels and rails on every residential drop. That spreads the weight, but it will not save a driveway that is already cracked or frost-heaved, and asphalt is vulnerable in hot weather. If the drive is the thing you are replacing, put the box right on it. If it is staying, we will look at gravel, the street or an alternative spot and give you a straight opinion before we set it down.
Service area
We deliver across Rock County and beyond
Verified sources
Local & Official Resources
We are a private hauler, not a government agency. For rules, fees and hours, always go straight to the source:
- City of Janesville — permits, right-of-way, refuse & recycling for city addresses
- Rock County, Wisconsin — county recycling, clean sweep and household hazardous waste
- Wisconsin DNR waste & materials management — Wisconsin landfill bans and recycling requirements
- E-Cycle Wisconsin — where TVs, monitors and computers must go instead
- Wisconsin DOT — seasonal weight limits and posted spring road restrictions
- Diggers Hotline (811) — call 811 before any digging or footing work